Things to do:
A. Living Room
1
Supply & install TV cabinet cum back drop panel for LCD in selected laminated finish
2
Supply & install full height cabinet for utilities @ Dining
3
Supply & install mirror at Dining
4
Reposition living room aircon
B. Master Bedroom
1
Supply & install master room full height PVC head board
2
Varnish wardrobe (no change in door) and change hinges
C. Bedroom 2 (next to master bedroom)
1
Supply & install study table cum full height bookshelf in selected laminated / veener finish
2
Varnish wardrobe (no change in door) and change hinges
D. Study Room (next to kitchen)
1
Supply & install full height wardrobe in selected veneer finish
E. Kitchen & Baths (1&2)
1
Supply labour & tool to hack existing wall/floor tiles, sanity fittings, vanity long bath etc.
2
Supply & apply waterproofing with level screed
3
Supply & lay selected wall tile include sand and cement screed
4
Supply & lay selected floor title include sand and cement screed
5
Supply & install vanity counter with bottom cabinet and top solid surfaces (basin & tap etc by owner)
6
Labour to install watercloset, basin, tap shower set. Etc supply by owner.
7
Supply & install mirror with glass shelving at Bath 1
8
Supply & install glass shelving at Bath 2
9
Supply & replace all water and discharge pipe within Bath and Kitchen
10
Supply & install kitchen cabinet top & bottom, top with solid surfaces (black granite top) and finishes in selected laminate/ veneer
11
Hack low wall (next to window) and extend kitchen cabinet (bottom) to the end of the kitchen.
General
1
Supply & install 1000mm height shoe cabinet at Entrance (about ~200mm above the ground)
2
Supply sand & varnish to 3 nos Bedroom
3
Supply machine to polish existing marble
4
Provision sum for alter and reposition socket, switches etc.
5
Replace aircon pipes and replace 3 nos air-con to bedrooms (Brand - Toshiba Inverter Sys 3, RAS 3M 20 SACV)
6
Replace main door and wrought iron main gate lock set
7
Varnish all 8 doors in the house (1master, 2bed rms, 1 kitchen, 2 toilets, 1 storeroom, 1 main door) and change hinges if necessary
8
Paint the whole house